Arctic Materials

Technical Data Sheet

Arcplast PR 110 Chlorinated Polyolefin Adhesion Primer

A thin-film, solvent-borne adhesion primer based on chlorinated polyolefin resin for polypropylene, TPO and filled polyolefin mouldings. It swells into the polyolefin surface and presents a polar film that conventional basecoats and topcoats can wet and bond to.

Grade Arcplast PR 110  |  Range Plastic and Decorative Coatings  |  Technology Solvent-borne chlorinated polyolefin resin solution

Arctic Materials

Technical Data Sheet
Arcplast PR 110
Issue 2026.09

1. Product description

A thin-film, solvent-borne adhesion primer based on chlorinated polyolefin resin for polypropylene, TPO and filled polyolefin mouldings. The chlorinated polyolefin swells into the polyolefin surface and presents a polar film that conventional basecoats and topcoats can wet and bond to. PR 110 is the lower build of the pair and is used where the primer only has to solve adhesion, with colour, gloss and durability carried by the coats above it.

2. Features

  • Chlorinated polyolefin adhesion route that anchors by swelling into the polyolefin surface rather than by oxidising it
  • Thin film of 5 to 8 microns dry; colour, gloss and durability are carried by the coats above
  • Wider process margin on flame, corona or plasma treated polyolefin; usable on untreated polyolefin with a narrower window
  • Wet on wet or wet on dry routes into the basecoat
  • Not intended as a standalone finish

3. Recommended uses

Adhesion primer on polypropylene, TPO, EPDM modified polyolefin and talc or glass filled PP mouldings that are to carry a decorative basecoat and topcoat or a soft-feel finish, including lines where flame, corona or plasma treatment is not available.

Substrates. Polypropylene, TPO, EPDM modified polyolefin, talc filled and glass filled PP. Flame, corona or plasma treatment is preferred and gives the widest process margin; on untreated polyolefin the primer carries the whole adhesion mechanism and the window is narrower. Not intended as a standalone finish.

4. Typical properties

PropertyTypical valueMethod
TechnologySolvent-borne chlorinated polyolefin resin solutionFormulation
AppearanceClear to slightly hazy liquid, colourless to pale yellowVisual
CarrierOrganic solvent blendFormulation
Non-volatile content5 to 15 per cent by weight, as suppliedISO 3251
Flow time at 23 degrees C35 to 60 s, ISO 3 mm cupISO 2431
Density at 23 degrees C0.85 to 0.95 g/cm³ISO 2811-1
Dry film thickness5 to 8 micronsISO 2808
Substrate wetting tension before priming, treated polyolefin38 mN/m minimum, checked within the validated interval after treatmentASTM D2578, a method written for polyolefin film and used here as a wetting tension check on mouldings
Cross-cut adhesionClass 0 to class 1, before and after humidity exposure, tested on the complete primer, basecoat and topcoat systemISO 2409, 2 mm cut spacing on plastic substrates
Condensation water resistance240 to 500 h with no blistering and no adhesion loss, tested on the complete systemISO 6270-2

Typical values, not a specification. Values for each batch are given on its Certificate of Analysis.

5. Application

ParameterGuidance
Application methodSpray, on rotating spindles or reciprocators
Surface preparationMouldings free of silicone and stearate release agents and handling contamination; flame, corona or plasma treated where the line allows, and coated within the validated interval after treatment, with parts past that interval re-treated rather than coated
DilutionAdjusted only with the thinner specified by Arctic for the grade, to the spray viscosity set for the line
Applied film thickness5 to 8 microns dry, checked as dry film thickness rather than judged from wet appearance
Wet on wet routeFlash 5 to 10 minutes at ambient, then apply the basecoat while the primer is dry to touch but uncured; the topcoat bake completes the cure of both layers
Wet on dry routeForce dry 20 to 30 minutes at 60 to 70 degrees C, cool, then apply the basecoat
Next coatDecorative basecoat and topcoat, or Arcplast SF 210 or SF 240 soft-feel topcoat

Process. Spray applied at 5 to 8 microns dry. Two routes. Wet on wet: flash 5 to 10 minutes at ambient, then apply the basecoat while the primer is dry to touch but uncured, and let the topcoat bake complete the cure of both layers. Wet on dry: force dry the primer 20 to 30 minutes at 60 to 70 degrees C, cool, then basecoat. Coat within the validated interval after pre-treatment, since treatment level decays with time.

6. Storage and handling

Store in the original closed containers in a cool, dry place away from direct heat, sunlight and frost, and reclose containers after use. Shelf life is stated on the label and Certificate of Analysis; refer to the Safety Data Sheet, issued on request, for handling. Handle and use the product in line with its Safety Data Sheet.

7. Safety and regulatory information

Read the Safety Data Sheet before use. Safety Data Sheets and regulatory declarations are issued by our technical centre against the product and batch supplied, so they are sent on request rather than published. Request a Safety Data Sheet or declaration.

This Technical Data Sheet is published for on-screen reference. The information is given in good faith from laboratory and application experience and describes typical values; it is not a specification and does not replace a trial on your own substrate and line. Arctic Materials may revise this sheet without notice. Issue 2026.09.

Technical Data Sheets on this site are for on-screen viewing. For a controlled copy, write to tech@arcticmaterials.com.