Arctic Materials

Technical Data Sheet

Arcstruct PR 220 Zinc Phosphate Barrier Primer

Two-pack epoxy primer pigmented with zinc phosphate and a lamellar extender, giving barrier and inhibitive protection to prepared steel in C2 to C4 atmospheric exposure. It is the general fabrication primer of the Arcstruct range, used where a zinc-rich film is not required or where the specification excludes metallic zinc.

Grade Arcstruct PR 220  |  Range Industrial and Infrastructure Coatings  |  Technology Two-pack solvent-borne epoxy with zinc phosphate and lamellar extender pigmentation

Arctic Materials

Technical Data Sheet
Arcstruct PR 220
Issue 2026.09

1. Product description

Two-pack epoxy primer pigmented with zinc phosphate and lamellar extender, for C2 to C4 atmospheric exposure where a zinc-rich film is not required, or where the specification excludes metallic zinc. It is the general fabrication primer of the range, easy to recoat and tolerant of shop handling. Chosen when barrier and inhibitive protection are sufficient and the priority is throughput and repairability.

2. Features

  • Barrier and inhibitive protection without metallic zinc
  • Lamellar extender lengthens the moisture path through the film
  • Overcoatable the same working day at 25 degrees Celsius
  • Tolerant of shop handling, easy to repair and recoat
  • Suits blast-cleaned steel, treated galvanised steel and abraded aluminium

3. Recommended uses

First coat on fabricated structural steel, plant and equipment for C2 to C4 atmospheric exposure where throughput and repairability come first, and on galvanised steel or aluminium ahead of an epoxy intermediate or polyurethane topcoat.

Substrates. Blast-cleaned carbon steel, shop-primed steel, galvanised steel after sweep blast or mordant wash, aluminium after abrasion

4. Typical properties

PropertyTypical valueMethod
TechnologyTwo-pack solvent-borne epoxy with zinc phosphate and lamellar extender pigmentationFormulation
FinishMatt, below 35 gloss units at 60 degrees, in the agreed primer shadeISO 2813
CompositionTwo-pack: pigmented epoxy base and curing agent in an organic solvent carrierFormulation
Volume solids50 to 70 per centISO 3233-1
Density, mixed1.4 to 1.7 g/cm3ISO 2811-1
Dry film thickness per coat50 to 80 micrometresISO 2808
Adhesion, pull-off from blast-cleaned steelTypically 5 to 15 MPa, cohesive failure preferred over adhesiveISO 4624 or ASTM D4541
Adhesion, cross-cutClassification 0 to 1ISO 2409
Solvent resistance, fully cured film50 to 100 MEK double rubs without softeningASTM D5402
Neutral salt spray resistance, complete system240 to 720 hours, set by the ISO 12944 corrosivity category and durability range, rated for blistering, rusting and undercuttingISO 9227, rated to ISO 4628-2, -3 and -8

Typical values, not a specification. Values for each batch are given on its Certificate of Analysis.

5. Application

ParameterGuidance
Application methodAirless or conventional spray for the main coat; brush and roller for stripe coats on edges and welds and for touch-up.
Surface preparationBlast-cleaned to Sa 2.5 to ISO 8501-1, with a medium grade profile to ISO 8503-2, typically 40 to 70 micrometres Ry5 with shot or 60 to 100 micrometres Ry5 with grit. On previously exposed steel, soluble salts are sampled to ISO 8502-6, measured to ISO 8502-9 and washed down to typically below 20 to 50 mg per square metre as chloride. Galvanised steel is sweep blasted or mordant washed; aluminium is abraded and degreased.
MixingBase and curing agent mixed completely at the stated ratio, given the stated induction time and used within the pot life, which shortens as temperature rises.
ThinningOnly with the thinner named for the grade, within the limit stated on the label.
Film thickness50 to 80 micrometres dry per coat, wet film checked with a comb during application and dry film verified to ISO 2808.
Conditions and cureSubstrate at least 3 degrees Celsius above the dew point during application and initial cure. Touch dry within a few hours and overcoatable the same working day at 25 degrees Celsius; full chemical cure in 7 to 10 days at 25 degrees Celsius, longer in cold conditions.
Next coatArcstruct EP 240 MIO Intermediate Coat in a three-coat system, or Arcstruct PU 260 Acrylic Polyurethane Topcoat in a two-coat system, applied within the stated overcoating interval.

Process. Airless spray, conventional spray or brush and roller for touch-up. Two-pack, mixed at the stated ratio with an induction period. Ambient cure, touch dry in a few hours, overcoatable the same working day at 25 C, full chemical cure in about seven days

6. Storage and handling

Store in the original closed containers under cover, dry and out of direct sun, at 5 to 35 degrees Celsius; stir the base to redisperse any settlement before mixing. Shelf life is stated on the label and the Certificate of Analysis. Handle and use the product in line with its Safety Data Sheet.

7. Safety and regulatory information

Read the Safety Data Sheet before use. Safety Data Sheets and regulatory declarations are issued by our technical centre against the product and batch supplied, so they are sent on request rather than published. Request a Safety Data Sheet or declaration.

This Technical Data Sheet is published for on-screen reference. The information is given in good faith from laboratory and application experience and describes typical values; it is not a specification and does not replace a trial on your own substrate and line. Arctic Materials may revise this sheet without notice. Issue 2026.09.

Technical Data Sheets on this site are for on-screen viewing. For a controlled copy, write to tech@arcticmaterials.com.